
MECHNEX Fire Protection
Fire pump rooms
Duty, standby and jockey pump sets with controllers, valves and test headers — installed, tested and maintained.
Scope
Codes & standards
Electric and diesel fire pumps
Jockey pumps and controllers
Suction and discharge pipework
Test headers and flow meters
Pump room ventilation and drainage
Performance testing
Systems are designed and installed to the project specification and the codes it calls up — typically the Saudi Building Code (SBC) together with international references such as NFPA, ASHRAE, IEC/BS and manufacturer requirements — and to the requirements of the authority having jurisdiction.
How we deliver
From drawing to handover
01Study & design
Risk, occupancy and code review; system selection and calculations.
02Submittals
Shop drawings and materials submitted for approval.
03Installation
Coordinated installation with other services on site.
04Testing
Tests witnessed and recorded against the approved design.
05Handover
As-built drawings, manuals, training and a maintenance plan.