
Quality, safety & compliance
How we control quality, protect people and document compliance — described as procedures, not claims.
Quality assurance & control
A project quality plan defines inspection and test plans (ITPs), hold and witness points, and non-conformance handling for every discipline.
- Project quality plan
- Inspection & test plans
- Non-conformance and corrective action records
Health, safety & environment
Every site starts with a site-specific HSE plan, risk assessments and method statements; incidents are recorded and investigated.
- Site HSE plan
- Risk assessments & method statements
- Toolbox talks and incident reporting
Engineering standards
We work to the project specification and the codes it calls up — typically the Saudi Building Code (SBC) and international references such as NFPA, ASHRAE and IEC/BS.
- Specification compliance statements
- Code references in submittals
- RFIs for any conflict or ambiguity
Inspection & testing
Pressure, insulation, functional and integrated tests are planned in advance, witnessed where required and recorded.
- Test procedures
- Witness test reports
- Commissioning records
Project documentation
Each project has a structured file: contract, drawings, approvals, correspondence, test records and handover documents.
- Document register
- Transmittals
- Handover file & O&M manuals